I gave a talk at Agile Yorkshire this evening – on the general theme of “how to maximise the amount of work not done”. Here’s what I covered:
- There’s no such thing as a requirement (so always challenge)
- The importance of prioritization (especially trimming the tail of the 80:20 curve)
- Feature splitting (including de-prioritizing the low value bits)
- Options Engineering (including the cheap option and the “do nothing” option)
For anyone that’s interested, here’s a copy of the slides:
- Powerpoint: Agile Yorkshire – 12-05-2015 – Tony Heap – There’s No Such Thing as a Requirement
- PDF: Agile Yorkshire – 12-05-2015 – Tony Heap – There’s No Such Thing as a Requirement
Thanks to everyone who attended and especially to Matt for the pint!